Finished Projects

 

Here you can find an overview of finished research projects at ISEA. If you are interested in one of our ongoingresearch projects, you can find them under the following link: Ongoing projects

 

The projects are grouped by the according research group:

Power Electronics and Electrical Drives

Modelling, Analytics and Lifetime Prediction

Battery System Design and Vehicle Integration

Grid Integration and Storage System Analysis

 

Power Electronics and Electrical Drives

Project Contact
HyFly
Duration: 01/01/2018 to 31/12/2019
Stefan Quabeck
HyFly
Duration: 01/03/2017 to 28/02/2019
Stefan Quabeck
HybridRail - Reduction of exhaust emissions of diesel-powered railway systems using an innovative, power-split hybrid drive train
Duration: 01/01/2017 to 30/06/2020
Stefan Quabeck
ThermoRaise - Thermal Model Predictive Control to Improve the Utilization of Electric Traction Motors
Duration: 01/09/2016 to 31/08/2018
Stefan Quabeck
TorqueDrive
Duration: 01/09/2016 to 30/11/2018
Stefan Quabeck
H3Top - Highly-efficient 3-level inverter topology for high-voltage traction drives with cost effective semiconductors
Duration: 01/02/2016 to 31/01/2019
Alexander Stippich
Luftstrom - Fast Switching and Bidirectional Charger based on Gallium Nitride Semiconductors
Duration: 01/01/2015 to 31/12/2017
Alexander Stippich
HV-ModAL
Duration: 01/01/2015 to 31/12/2017
Alexander Stippich
HiREX - Highly Integrated High-Speed Range Extender Module
Duration: 01/01/2015 to 31/03/2018
Stefan Quabeck
mobilEM - Aging of the winding isolation due to high voltage slopes
Duration: 01/10/2013 to 31/03/2018
Alexander Stippich
mobilEM – Integrated DC-DC Converter
Duration: 01/01/2013 to 31/03/2018
Alexander Stippich
 
 

back to top

 

Modelling, Analytics and Lifetime Prediction

Project Contact
Lithium Transport Mechanisms
Duration: 01/08/2017 to 31/07/2019
SSALT
Duration: 01/08/2017 to 31/07/2019
Raffzyklen - Accelerated Lifetime Testing of Lithium-Ion-Batteries for Faster Approval of New Cell Designs
Duration: 01/08/2017 to 31/07/2019
Effi.CoM - Optical and Acoustic Coating Monitoring in advanced Production Process
Duration: 01/01/2016 to 31/12/2017
openBat - Open Source Battery-Aging-Tool for the Lifetime Prediction of Battery-Packs with Respect to Uncertainties and a Distribution of Production Quality
Duration: 01/09/2015 to 31/08/2018
 
 

back to top

 

Battery System Design and Vehicle Integration

Project Contact
X-EMU - Development and Validation of a High-Power-Fuel-Cell-Drive-Train for Hybrid-EMU-Railways
Duration: 01/10/2017 to 30/09/2019
DUETT - Diesel-hybrid vehicles for an environmental friendly mobility
Duration: 01/05/2017 to 30/04/2020
Dominik Jöst
BSMS - Development of a management system for stationary battery storage system for intelligent usage of storage capacity and optimized life time
Duration: 01/02/2016 to 31/01/2019
Weihan Li
Mun-E-P 2 - Municipal E-Bus Planner 2
Duration: 01/07/2015 to 30/06/2018
Holger Pigerl
ELIPTIC - Electrification of Public Transport in Cities
Duration: 01/06/2015 to 31/05/2018
ZeEUS - Zero Emission Urban Bus System
Duration: 01/11/2013 to 30/04/2018
 
 

back to top

 

Grid Integration and Storage System Analysis

Project Contact
FEN P1 - Flexible Electrical Grids P1
Duration: 01/10/2017 to 31/03/2019
TILOS - Technology Innovation for the Local Scale Optimum Integration of Battery Energy Storage
Duration: 01/02/2015 to 31/01/2019
GENESYS - Genetic Optimisation of a European Energy Supply System
Duration: 01/08/2014 to 31/12/2017
Bussar, Christian
CO2 free delivery in Bonn
Duration: 01/01/2013 to 31/12/2015
GOELK - Small Commercially Operated Electric Fleets
Duration: 01/01/2013 to 31/12/2015
 

back to top