Ongoing Projects

 

Here you can find an overview of our currently ongoing research projects at ISEA. If you are interested in one of our finished research projects, you can find them under the following link: finished public projects

 

The projects are grouped by the according research group:

Power Electronics and Electrical Drives

Reliable Power Electronic Systems

Modelling, Analytics and Lifetime Prediction

Battery System Design and Vehicle Integration

Grid Integration and Storage System Analysis

Ageing and Lifetime Prediction of Batteries

 

Power Electronics and Electrical Drives

Project Contact
KIRA
Duration: 01/08/2021 to 31/07/2024
Stefan Quabeck
FlexSBus
Duration: 01/06/2021 to 31/05/2024
Stefan Quabeck
RobKom - Robust Communication in Autonomous Electric Vehicles
Duration: 01/11/2018 to 31/10/2021
Alexander Stippich
VERSE
Duration: 01/10/2018 to 30/09/2021
Stefan Quabeck
ALigN
Duration: 01/09/2018 to 30/09/2020
Alexander Stippich
SiCnifikant - SiC-based Traction Inverters for Innovative Drive Concepts
Duration: 01/09/2018 to 31/08/2021
Alexander Stippich
SiCool – Highly integrated SiC power electronics on thermally partitioned ceramic substrates
Duration: 01/09/2018 to 31/08/2021
Alexander Stippich
SiCmodul – SiC-Based Modular Power Electronics for Fail-Safe Drive Technology
Duration: 01/01/2018 to 31/12/2020
Alexander Stippich
 
 

back to top

 

Reliable Power Electronic Systems

Project Contact
Electroluminescence Sensing for SiC power modules
Duration: 01/05/2020 to 30/04/2023
Christoph van der Broeck
ZuLeSELF - Condition monitoring of power electronics for electric production vehicles
Duration: 01/09/2018 to 31/08/2021
Christoph van der Broeck
 
 

back to top

 

Modelling, Analytics and Lifetime Prediction

Project Contact
E-FloA
Duration: 01/01/2021 to 31/12/2023
Gereon Stahl
InOPlaBat
Duration: 01/01/2021 to 31/12/2024
Heinrich Ditler
BALd
Duration: 01/12/2020 to 30/11/2023
Ahmed Chahbaz
BattNutzung – Kompetenzcluster Batterienutzungskonzepte
Duration: 01/09/2020 to 28/02/2024
Mark Junker
*** greenBattNutzung – Begleitprojekt Batterielebenszyklus ***
Duration: 01/09/2020 to 29/02/2024
Mark Junker
3beLiEVe
Duration: 01/01/2020 to 01/06/2023
Fabian Frie
MEET Hi-EnD III
Duration: 01/11/2019 to 31/10/2022
Fabian Frie
MobilEM - Post graduate program "Integrated Energy Supply Modules for Roadbound E-Mobility"
Duration: 01/10/2019 to 30/09/2022
Fabian Frie
HiT-Cell - Development of a temperature resistant lithium-ion-cell
Duration: 01/01/2018 to 30/06/2021
Fabian Frie
AddESun - Logo Luftstrom Innovative Materials for Stationary Lead-Acid-Batteries
Duration: 01/09/2017 to 31/08/2021
Fabian Frie
GrEEn - Green Electrochemical Energy Storages
Duration: 01/07/2017 to 31/12/2021
Fabian Frie
 
 

back to top

 

Battery System Design and Vehicle Integration

Project Contact
ECO-CAR
Duration: 15/01/2021 to 14/01/2024
Florian Ringbeck
Model2Life
Duration: 01/01/2021 to 31/12/2023
Dominik Jöst
SimBAS
Duration: 01/01/2021 to 31/12/2023
Stephan Bihn
OSLiB
Duration: 01/11/2020 to 31/10/2023
Stephan Bihn
Nautilus
Duration: 01/07/2020 to 30/06/2024
Cem Ünlübayir
GradiBatt
Duration: 01/10/2019 to 30/09/2021
Matthias Faber
E2Fuels
Duration: 01/10/2018 to 30/09/2021
Philipp Dechent
EVERLASTING - Electric Vehicle Enhanced Range, Lifetime And Safety Through INGenious battery management
Duration: 01/09/2016 to 31/08/2020
Alexander Blömeke
 
 

back to top

 

Grid Integration and Storage System Analysis

Project Contact
EMMUseBat
Duration: 01/07/2021 to 30/06/2024
Kevin Jacqué
BetterBat
Duration: 01/03/2021 to 29/02/2024
Jan Figgener
BeNutz LaSA
Duration: 01/10/2020 to 30/09/2023
Christopher Hecht
InEEd-DC
Duration: 01/05/2020 to 01/05/2025
Bussar, Christian
open_MODEX
Duration: 01/01/2019 to 31/12/2021
Bussar, Christian
FlexMex
Duration: 01/01/2019 to 31/12/2021
Bussar, Christian
InFIS
Duration: 01/07/2018 to 31/12/2021
Bussar, Christian
WMEP (KfW 275) - Scientific measurement and evaluation program of pv battery systems 2.0
Duration: 01/12/2016 to 31/12/2019
Jan Figgener
M5BAT - Modular Multi-Megawatt Multi-Technology Medium Voltage – Battery Storage System
Duration: 01/07/2013 to 30/06/2018
Kevin Jacqué
 

Ageing and Lifetime Prediction of Batteries

Project Contact
SAFELiMOVE
Duration: 01/10/2019 to 30/09/2021
Mark Junker
Speichermonitoring BW
Duration: 01/02/2018 to 31/12/2020
Sebastian Zurmühlen
 

back to top